We spent some time talking to the strawbale architect consultant about building today, and the price for the timber frame alone is prohibitive, and startling given the costs we’d seen for kit-built-post-and-beam houses.

Some of the cost assumptions we can tweak, because we’re happy to do things like using used components as long as they meet current requirements. Both houses we’ve had had salvage bathroom components, and electrical I’ve discovered that Habitat for Humanity have big plastic boxes filled with sockets and light switches, some of which are clearly nearly new.

Also, our requirements for the kitchen are ‘it has a sink, stove and fridge’, we can “finish” it later. Indeed, the entire house, our finishing requirements are that the walls are plastered, and the electrics are in.

Anyhow, at the moment we’ve gone from excited to ‘trying to figure out some way to make this happen at all’.

Originally published at Mostly lemon based. You can comment here or there.

January 2023

S M T W T F S
1234567
891011 121314
15 161718192021
22232425262728
293031    

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Jul. 28th, 2025 02:46 pm
Powered by Dreamwidth Studios