So when we got our septic design done, we failed to communicate sufficiently well that the giant, old, big leaf maple tree was one of the trees that we were absolutely committed to saving. Since then we’ve moved house and got new jobs, and furnished our new apartment and so on. This has meant our house has been on hold. Given that we can’t put it up this year, that’d taken the pressure off anyway…

But now? Now we want to get moving again which is always tricky. Getting momentum going for something as big as a house project is challenging.

With that in mind, next week we are hopefully* going out to cut a little pathway so that we can move the septic. The first step in getting our house built. We also really need to go out and fill back in the original perc holes.

The original plan** called for the septic to essentially lie into the roots of the maple tree:

original_layout

The new plan:

modified_layout

See the beautiful modifications. Actually, this was done as a very quick sketch to explain to our septic guy what we want to do. He is, shall we say, ‘reluctant’ to be drawn on whether there will be any problems doing this, although we’re unsure why there would be, or why the soil 50 ft to the east of the current perc holes would be dramatically worse than the soil in the place they dug the first lot. And we both are of the opinion that there’s a lot of land we’re currently planning to leave ‘as is’ and just maintain, all of which we could consider for septic sites…

Anyhow, this time we’re going to be there in person so we can say ‘yes’ or ‘no’. We’ve also marked out roughly the route of the drive (which we’ve kinda-sorta-sketched on the map). We’re also hoping to put the septic near the drive so it can be emptied, when that time comes.

Once the septic and well are in… we can actually start moving forward. Septic, well, power, foundations… then we get to design the building. The yay.

* While our groundworks guy gave us the suggested day, he’s not yet confirmed that we’re booked in with him for the time we said.
** We’re actually building a 2 bed house, but putting in a 3 bed septic

Originally published at Mostly lemon based. You can comment here or there.

January 2023

S M T W T F S
1234567
891011 121314
15 161718192021
22232425262728
293031    

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Jul. 9th, 2025 08:50 am
Powered by Dreamwidth Studios